In its unpublished M.A.C. Rule 23.0 decision affirming the Land Court’s ruling, the Massachusetts Appeals Court concluded in Kearsarge Walpole LLC vs. Zoning Bd. of Appeals of Walpole, Mass. App. Ct., No. 23-P-128 (2024) that...more
Massachusetts’ achievement of 2025 net zero greenhouse gas (GHG) emissions rests upon rapid electrification of the energy grid and substantial growth in solar electricity generation. As of 2023, nearly a quarter of the...more
Eversource’s launch of its new networked geothermal system pilot project in Framingham has drawn significant interest as Massachusetts’ first gas utility-operated ground source heating and cooling project. Eversource’s...more
On April 2, 2024, the Attorney General’s Municipal Law Unit rejected a portion of the Town of Sherborn’s zoning bylaw amendment pertaining to restrictions on battery energy storage systems (“BESS”), but allowed the...more
On January 11, 2024, the Massachusetts Department of Environmental Protection (MassDEP) held virtual stakeholder meetings to receive public comment on the MassDEP’s suggested options for strengthening the ability of the...more
In its September 19, 2023 letter disapproving the Town of Mansfield’s limitation on battery energy storage systems (“Mansfield letter”), under Warrant Article S15 (Zoning) voted at the Wareham Special Town Meeting of April...more
The July 6, 2023, report presented by Synapse Energy Economics, Inc. concludes that “Massachusetts’ technical solar potential is 506 GWAC, 15 to 18 times greater than the amount required by the [Massachusetts Clean Energy and...more
On May 11, 2023, the Massachusetts Energy Facilities Siting Board (“EFSB”) dismissed the Petition of Medway Grid, LLC to construct a 250-megawatt, 500-megawatt hour battery energy storage system (“BESS”) in Medway,...more