Data, Architectural Engineering, and Designing a Better Future
Design-Build: Everything That Was Old Is New Again
In this Insight, first published in PLC, Partner Shy Jackson considers the JCT's Target Cost Contract, 2024 Edition (TCC 2024), a new addition to its 2024 Edition contract suite that reflects the wider industry trend towards...more
It is not uncommon for issues to arise when the Guaranteed Maximum Price (GMP) Proposal is submitted to the owner by a Construction Manager at Risk (CMR) or Design Builder (DB). Usually, such issues can be worked out to the...more