Project Catalyst an Economic Development Video Podcast | Episode 16: Powering Alabama’s Economic Progress with Leigh Davis of Alabama Power Company
JONES DAY TALKS®: Real Assets Roundup: A New Look at Real Estate, Energy, and Infrastructure - Episode 1
Navigating Renewable Energy: Insights from the ACP Siting and Permitting Conference - Energy Law Insights
Navigating the Inflation Reduction Act: Insights on Brownfield Energy Community Credits - Energy Law Insights
Harnessing Technology in Litigation: Insights from Troutman Pepper eMerge - Energy Law Insights
Growing the Solar and Storage Landscape With Mike Hall, Anza Renewables - Battery + Storage Podcast
Navigating Complexities in Tax Equity Transactions - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 2) - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 1) - Energy Law Insights
Podcast - Gestión del gobierno en el sector de energía: Una mirada desde los entes de control
Navigating Clean Hydrogen Tax Credits: Insights and Implications - Energy Law Insights
Expanding Energy Storage Through Cross-Cultural Insights With Dr. Marco Terruzzin, Energy Vault — Battery + Storage Podcast
Minería en tiempos de transición energética
Storing Gravitational and Hybrid Energy, With Dr. Raj Talluri, Enovix — Battery + Storage Podcast
Podcast - Panorama del sector energético en Colombia
Extending the Flexibility of Energy Storage With Julia Souder, LDESC — Battery + Storage Podcast
Power, Privacy, and Protection: Unpacking Security Challenges in the Energy Sector - Energy Law Insights
Non-Delegation Doctrine, FTC's Non-Compete Rule and Green Guides ... Oh My!
Duke Develops Flexible Energy Storage Options to Enhance Reliability and Maximize Value With Laurel Meeks, Duke Energy — Battery + Storage Podcast
Economics of the Energy Transition: Keith Fullenweider on Wharton Business Daily
On June 18, 2025, FERC temporarily raised the cost limits for blanket certificate natural gas pipeline projects constructed and placed into service by May 31, 2027, from $41 million to $61.65 million. Citing what it called a...more
Below are brief summaries of the agenda items for the Federal Energy Regulatory Commission's (FERC or the Commission) open meeting to be held on June 26, at 10:00 a.m. ET....more
Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues....more
On May 22, 2025, the House passed budget reconciliation legislation referred to as “The One, Big, Beautiful Bill” (the “Bill”). As currently written, the Bill would reshape key aspects of federal energy policy by targeting...more
On May 11, the House Committee on Energy and Commerce released its proposed energy provisions for inclusion in the budget reconciliation package, including several provisions that could dramatically reform the federal...more
Welcome to our fifth issue of Currents 2025. We are covering a multitude of issues in this edition, but we want to pass along an announcement and an event notice first. Again, thank you for reading! Tapping Into Common...more
On April 25, 2025, FERC approved two uncontested stipulation and agreements that propose to settle the Natural Gas Act (“NGA”) section 4 general rate cases filed on May 30, 2024, by two interconnected pipelines, Algonquin Gas...more
On April 24, 2025, FERC denied NGO Transmission, Inc.’s (“NGO Transmission”) application under 7(b) of the Natural Gas Act (“NGA”) to abandon its jurisdictional facilities and reclassify them from jurisdictional transmission...more
On March 28, 2025, the D.C. Circuit denied a joint petition for review brought by Healthy Gulf and Sierra Club (together, “Petitioners”) challenging FERC’s grant of a certificate of public convenience and necessity (CPCN) to...more
In a February 7, 2025 decision in Simon v. Sunoco Pipeline LP, No. 2015-3302 (Wash. Cty. February 7, 2025), the Court of Common Pleas of Washington County, Pennsylvania concluded that Sunoco Pipeline LP and Sunoco Logistics...more
As we enter 2025 with a new president in the White House and Republicans in control of both the House and the Senate, we can look forward to a significant shift in the landscape for oil & gas transactions. The second Trump...more
On December 20, 2024, the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) upheld FERC’s order authorizing Stingray Pipeline Company, L.L.C. (“Stingray”) to abandon a portion of its...more
In a series of recent orders, the D.C. Circuit has renewed its prodding of the Federal Energy Regulatory Commission ("Commission" or "FERC") to strengthen its environmental reviews of proposed pipeline projects. On July 30,...more
When he assumes office again on January 20, 2025, newly reelected President Donald J. Trump can make one move regarding energy that not only will facilitate the increased availability of domestic oil and gas production but...more
On August 20, 2024, the Federal Energy Regulatory Commission (“FERC”) issued an order rejecting, without prejudice, a contested proposal from Basin Electric Power Cooperative (“Basin”) to establish special wholesale power...more
Carbon Quarterly is a newsletter covering developments in carbon policy, law, and innovation. No matter your views on climate change policy, there is no avoiding an increasing focus on carbon regulation, resiliency planning,...more
On July 16, 2024, the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) found that FERC failed to adequately consider a liquefied natural gas (“LNG”) project’s greenhouse gas (“GHG”)...more
The permitting process has been identified by numerous commentators as a major cause of delays in the development of energy, infrastructure, and mining projects in the United States. ...more
On July 22, 2024, U.S. Senators Joe Manchin (I-WV) and John Barrasso (R-WY) released a long-awaited energy permitting reform bill, which aims to accelerate the permitting process for critical energy, mineral, and related...more
On March 12, 2024, the U.S. Court of Appeals for the Third Circuit upheld a prospective rule change to PJM Interconnection, L.L.C.’s (“PJM”) annual capacity auction but struck down attempts by PJM and FERC to apply the rule...more
On March 28, 2024, the Midcontinent Independent System Operator, Inc. (“MISO”) submitted a filing to the Federal Energy Regulatory Commission (“FERC”) proposing revisions to its Open Access Transmission, Energy and Operating...more
The United States Court of Appeals for the District of Columbia (“D.C. Circuit”) recently upheld two FERC orders granting natural gas pipeline developers’ requests to extend their construction deadlines. The D.C. Circuit...more
On March 21, 2024, FERC issued a Notice of Inquiry (“NOI”) seeking additional information on whether the Commission should continue to allow interstate pipelines to package “high value” capacity with non-contiguous and...more
At the February 15, 2024, FERC open meeting and in four orders issued the same day, FERC established a new policy governing its issuance of preliminary permits under section 4(f) of the Federal Power Act (“FPA”), pursuant to...more
On January 18, 2024, FERC granted a certificate of public convenience and necessity to Transcontinental Gas Pipe Line Company, LLC (“Transco”) to construct and operate the Texas to Louisiana Energy Pathway Project (“Texas to...more