Project Catalyst an Economic Development Video Podcast | Episode 16: Powering Alabama’s Economic Progress with Leigh Davis of Alabama Power Company
JONES DAY TALKS®: Real Assets Roundup: A New Look at Real Estate, Energy, and Infrastructure - Episode 1
Navigating Renewable Energy: Insights from the ACP Siting and Permitting Conference - Energy Law Insights
Navigating the Inflation Reduction Act: Insights on Brownfield Energy Community Credits - Energy Law Insights
Harnessing Technology in Litigation: Insights from Troutman Pepper eMerge - Energy Law Insights
Growing the Solar and Storage Landscape With Mike Hall, Anza Renewables - Battery + Storage Podcast
Navigating Complexities in Tax Equity Transactions - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 2) - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 1) - Energy Law Insights
Podcast - Gestión del gobierno en el sector de energía: Una mirada desde los entes de control
Navigating Clean Hydrogen Tax Credits: Insights and Implications - Energy Law Insights
Expanding Energy Storage Through Cross-Cultural Insights With Dr. Marco Terruzzin, Energy Vault — Battery + Storage Podcast
Minería en tiempos de transición energética
Storing Gravitational and Hybrid Energy, With Dr. Raj Talluri, Enovix — Battery + Storage Podcast
Podcast - Panorama del sector energético en Colombia
Extending the Flexibility of Energy Storage With Julia Souder, LDESC — Battery + Storage Podcast
Power, Privacy, and Protection: Unpacking Security Challenges in the Energy Sector - Energy Law Insights
Non-Delegation Doctrine, FTC's Non-Compete Rule and Green Guides ... Oh My!
Duke Develops Flexible Energy Storage Options to Enhance Reliability and Maximize Value With Laurel Meeks, Duke Energy — Battery + Storage Podcast
Economics of the Energy Transition: Keith Fullenweider on Wharton Business Daily
On June 18, 2025, FERC temporarily raised the cost limits for blanket certificate natural gas pipeline projects constructed and placed into service by May 31, 2027, from $41 million to $61.65 million. Citing what it called a...more
On June 11, the Supreme Court issued a major decision in Seven County Infrastructure Coalition v. Eagle County, Colorado that could reshape how infrastructure projects are reviewed, approved, and challenged under the National...more
On May 29, 2025, the Supreme Court—minus recused Justice Neil Gorsuch—decided Seven County Infrastructure Coalition v. Eagle County, the first major NEPA dispute before the Court in 20 years. It’s a really big deal—coverage...more
Overview - On May 29, 2025, the Supreme Court issued a significant decision in Seven County Infrastructure Coalition v. Eagle County, 605 U.S. __ (2025), clarifying the scope of judicial deference to agencies’ procedural...more
After nearly two decades of silence, the US Supreme Court on May 29, 2025, weighed in on an issue that has tremendous significance for permitting of complex infrastructure and other development projects—the depth and breadth...more
Overview - On May 29, 2025, the U.S. Supreme Court issued a significant decision clarifying the scope of environmental review required under the National Environmental Policy Act (“NEPA”) for major infrastructure...more
A unanimous U.S. Supreme Court ruled on May 29 that lower courts had overstepped their bounds when reviewing federal agency actions pursuant to the National Environmental Policy Act (NEPA). The decision in Seven County...more
In a significant decision issued on May 29, 2025, the U.S. Supreme Court found that the Surface Transportation Board (the Board) was entitled to substantial deference under the National Environmental Policy Act (NEPA) and...more
On May 29, 2025, the Supreme Court held that the National Environmental Policy Act (NEPA) — which requires federal agencies to analyze the environmental impacts of projects that they carry out, fund, or approve — does not...more
On May 29, 2025, the Supreme Court issued its opinion in Seven County Infrastructure Coalition v. Eagle County that promises to significantly alter the scope of judicial review of environmental reviews performed under the...more
New laws have been issued for the Mexican electricity sector, establishing a new dynamic between the public and private sectors....more
On April 24, 2025, FERC denied NGO Transmission, Inc.’s (“NGO Transmission”) application under 7(b) of the Natural Gas Act (“NGA”) to abandon its jurisdictional facilities and reclassify them from jurisdictional transmission...more
Governor Gavin Newsom is pushing to lay the groundwork for building a $20-billion water tunnel in the Sacramento-San Joaquin River Delta before his term expires, and state water regulators are considering whether to grant a...more
In its 2024–2025 Draft Transmission Plan (Draft Plan) released on March 31, the California Independent System Operator (CAISO) proposed the development of 31 new transmission projects with an estimated cost of $4.8 billion....more
U.S. Agencies Agree to Slash Approval Times for Infrastructure Projects - "More than a dozen federal agencies agreed to slash the time needed for environmental reviews and permitting on major infrastructure projects, a...more