Regulatory Ramblings: Episode 75 - Rethinking Hong Kong’s Startup Ecosystem and Its Legal Foundations with Syed Musheer Ahmed, Joshua Chu, and David Cameron
JONES DAY TALKS®: Real Assets Roundup Episode 3: One Big Beautiful Bill (OB3)
Breaking the Cycle: Flooding, Infrastructure, and Climate Law in Practice
JONES DAY TALKS®: Real Assets Roundup Episode 2: A First Look at Data Centers: The Fourth Utility
Project Catalyst an Economic Development Video Podcast | Episode 16: Powering Alabama’s Economic Progress with Leigh Davis of Alabama Power Company
JONES DAY TALKS®: Real Assets Roundup: A New Look at Real Estate, Energy, and Infrastructure - Episode 1
London Partner Roberta Downey Wired for Disputes: Tech, Infrastructure, and the New Frontier of Risk
Project Catalyst: An Economic Development Podcast | Episode 14: Shaping North Carolina’s Economic Future with Secretary of Commerce Lee Lilley
Innovation in Compliance: Visionary Leadership with Jackson Calame
AGG Talks: Cross-Border Business Podcast - Episode 21: The 2024 U.S. Election’s Impact on ESG Regulations
Business Better Podcast Episode: The Infrastructure Investment and Jobs Act – Insights Three Years Later
Project Catalyst: An Economic Development Podcast | Episode 9: The Role of Railways in Economic Development with Brian Gwin of Norfolk Southern
Come & Take It: The Eminent Domain Podcast (Episode #13), Featuring Winstead Shareholder Tom Forestier
Build America Buy America What is it? How to qualify.
Data Centers: Demand, Development, and Future Challenges With Ali Greenwood — TAG Infrastructure Talks Podcast
Preparing for Major Changes to DOT’s Disadvantaged Business Enterprise DBE Program
Charging Transportation Electrification Forward: Identifying Opportunities & Regulatory Solutions in the Rapidly Evolving EV Market - Energy Law Insights
Powering Through the Environmental Challenges of EV Development - Energy Law Insights
Exploring Challenges and Opportunities Within the EV Infrastructure Sector With Kerri Stewart - TAG Infrastructure Talks Podcast
Wiley's 10 Key Trade Developments: The CHIPS Act and Inflation Reduction Act (IRA)
PJM-ready projects are a must. Eligible projects must (1) be transmission-connected (PJM bulk power system) and located in a New Jersey transmission zone; (2) have PJM interconnection approval (or capacity interconnection...more
The California Independent System Operator Board of Governors has approved the ISO’s 2024-2025 transmission plan, recommending 31 infrastructure projects to help meet projected load growth and changing grid conditions....more
Last month, the Illinois General Assembly passed a bill establishing prevailing wage requirements and tax incentives for high voltage transmission line and utility-scale battery storage projects....more
North Carolina enacted legislation in 2023 that imposes new state-level decommissioning and financial assurance requirements on owners of utility-scale solar projects. S.L. 2023-58. All utility-scale solar project owners will...more
What is BESS? Battery storage or “BESS” (Battery Energy Storage Systems) projects are electrochemical infrastructure assets that allow energy to be stored and released on demand, and most of these projects are Lithium-Ion...more
Minnesota Governor Tim Walz recently signed into law sweeping energy legislation designed to ease permitting burdens on renewable energy development and address interconnection and transmission congestion in the state (the...more
On May 13, 2024, the Federal Energy Regulatory Commission (FERC or Commission) issued Order No. 1920,[1] its long-awaited Final Rule relating to long-term regional planning and regional cost allocation. This article...more
On 21 March 2024, the Federal Energy Regulatory Commission (FERC) issued Order No. 2023-A, rehearing and clarifying its landmark generator interconnection reform final rule. Order No. 2023-A largely upheld the...more
On March 22, 2024, Foley Hoag hosted the latest gathering of the New England Electricity Restructuring Roundtable. The Roundtable, which has been meeting regularly since 1995, was originally organized to contemplate the...more
On October 19, 2023, FERC accepted ISO New England Inc.’s (“ISO-NE”) proposal to allow electric storage facilities to be planned and operated as transmission-only assets (“SATOAs”) to address system needs identified in the...more
Midcontinent Independent System Operator (MISO) has issued a report analyzing the effects of renewable energy growth in the MISO region and concluding that the system can reliably accommodate a significant percentage of...more
In November 2019, New Jersey Governor Phil Murphy issued Executive Order 92 increasing the state’s offshore wind generation goal from 3,500 MW by 2030 to 7,500 MW by 2035....more
On May 30, A Word About Wind held its first annual Financing Wind New York conference. Tickets to the conference sold out and the attendees were generally wind pros with considerable experience. The panelists provided many...more